AMNYTT amnytt.no 2/2025 | Page 82

Optimizing the processes along the value chain

Every single process step in the value chain for control cabinet building holds potential for optimization – from the planning and engineering of your project through logistics , the mechanical processing of the control cabinet , the assembly and marking of terminal strips to the wiring and commissioning of the control cabinet .
Phoenix Contact ’ s partnership-based approach looks at the individual need for action and identifies challenges ranging from a shortage of skilled workers to cost reductions and efficiency improvements .
Engineering and planning processes
Production-oriented engineering and item management
Logistics
Material availability and provision based on production requirements
Material flow and CIP
Optimization of material flow and implementation of a continuous improvement process
Data consistency
Ensuring smooth , cross-process data flow
Workstation design
Realization of ergonomic , structured , and transparent workstations
4 Phoenix Contact